Why changing the way to measure the risk ? - Ineris - Institut national de l'environnement industriel et des risques Access content directly
Conference Papers Year : 1999

Why changing the way to measure the risk ?

Abstract

The SEVESO II Directive gives the rules to identify high risk potential establishments with the amount of hazardous substances handled and their operators have to produce safety reports. Although rules are well established to identify potential risk, there is no method to measure the risk level which takes into account safety devices and safety management Systems implemented by operators.
Fichier principal
Vignette du fichier
1999-067_hal.pdf (391.25 Ko) Télécharger le fichier
Origin : Files produced by the author(s)
Loading...

Dates and versions

ineris-00972180 , version 1 (03-04-2014)

Identifiers

Cite

Olivier Salvi, Didier Gaston. Why changing the way to measure the risk ?. 9. Annuel Conference "Risk Analysis", Oct 1999, Rotterdam, Netherlands. pp.263-267. ⟨ineris-00972180⟩

Collections

INERIS
69 View
123 Download

Share

Gmail Facebook Twitter LinkedIn More